Home > Notice of Letting > Contract Detail

March 09, 2018 Letting 10:00 AM
128-89736

Bulletin Description

Replace the bridge carrying CH 8 over an unnamed tributary of the West Fork River, 2 miles northwest of Osceola.
Region District DBE % VBP % Federal Project #
3 4 7.00 0.00 GKF1(618)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Stark
  • FAS 1193
  • 14-00178-00-BR
  • C-94-021-18
  • 4-10601-0000
Contract Specifics
Completion Date: July 06, 2018
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of February 27, 2018 04:30 PM.

  • The Schedule for Woven Wire Fence only provides the Length of the fence. Fence Generally changes direction and elevation within a single run. Are we to assume that these are single straight runs that don not have any change in direct or elevation? Please provide a layout.
    The fence will be replaced along the right-of-way line or as directed by the Engineer. The contractor should not assume the fence will be a straight line. (02/28/2018)

  • Item 66500105 Woven Wire Fence 4 is not shown in the plans. Please provide a plan layout of the proposed item.
    See the chart for WOVEN WIRE FENCE, 4' on plan sheet #3 (02/27/2018)

Authorized Bidders

  • 1304 Curnyn Construction Co.
    1 Hawkeye Lane
    Geneseo, IL 61254
    PO Box 106
    Geneseo, IL 61254
    Phone: (309) 944-6456 Fax: (309) 944-8282 Email: curnynco@nbson.net
    $264,240.60

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com

  • 2824 Illinois Civil Contractors, Inc.
    420 Pinecrest Drive
    East Peoria, IL 61611
    Phone: (309) 694-4224 Fax: (309) 694-5676 Email: mfehr@ilcivil.com

  • 3391 Laverdiere Construction, Inc.
    4055 W Jackson St
    Macomb, IL 61455
    Phone: (309) 837-1258 Fax: (309) 833-4993 Email: mlynn@lavconinc.com

  • 0335 Otto Baum Company, Inc.
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: johnbasham@ottobaum.com
    $299,848.76

  • 5672 Stark Excavating, Inc.
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com
    $300,126.93

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 460.000
20400800 CU YD FURNISHED EXCAVATION Base items 270.000
21001000 SQ YD GEOTECHNICAL FABRIC FOR GROUND STABILIZATION Base items 1,156.000
28100807 TON STONE DUMPED RIPRAP, CLASS A4 Base items 90.000
35100100 TON AGGREGATE BASE COURSE, TYPE A Base items 729.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 2,200.000
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 352.000
40603510 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX "C", N50 Base items 82.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 95.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 1.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 20,750.000
50900205 FOOT STEEL RAILING, TYPE S1 Base items 25.000
51500100 EACH NAME PLATES Base items 1.000
54003000 CU YD CONCRETE BOX CULVERTS Base items 115.600
66500105 FOOT WOVEN WIRE FENCE, 4' Base items 415.000
67100100 L SUM MOBILIZATION Base items 1.000
70101830 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21 Base items 1.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 1,600.000
X0300006 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50 Base items 137.000
X0322128 SQ YD MEMBRANE WATERPROOFING FOR BURIED STRUCTURES Base items 107.000
X2070302 TON POROUS GRANULAR EMBANKMENT (SPECIAL) Base items 750.000
X2090210 CU YD POROUS GRANULAR BACKFILL (SPECIAL) Base items 40.000
X2501000 ACRE SEEDING, CLASS 2 (SPECIAL) Base items 0.500
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.