Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 7.00 | 0.00 | JYHN(107) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
30 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20101000 | FOOT | TEMPORARY FENCE | Base items | 4,641.000 | |||
20200100 | CU YD | EARTH EXCAVATION | Base items | 626.000 | |||
20800150 | CU YD | TRENCH BACKFILL | Base items | 4.000 | |||
21001000 | SQ YD | GEOTECHNICAL FABRIC FOR GROUND STABILIZATION | Base items | 6,336.000 | |||
21101505 | CU YD | TOPSOIL EXCAVATION AND PLACEMENT | Base items | 637.000 | |||
21101625 | SQ YD | TOPSOIL FURNISH AND PLACE, 6" | Base items | 4,255.000 | |||
25000200 | ACRE | SEEDING, CLASS 2 | Base items | 3.000 | |||
25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 270.000 | |||
25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 270.000 | |||
25100630 | SQ YD | EROSION CONTROL BLANKET | Base items | 14,520.000 | |||
25200110 | SQ YD | SODDING, SALT TOLERANT | Base items | 60.000 | |||
25200200 | UNIT | SUPPLEMENTAL WATERING | Base items | 1.000 | |||
28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 2,143.000 | |||
28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 100.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 6,893.000 | |||
35101600 | SQ YD | AGGREGATE BASE COURSE, TYPE B 4" | Base items | 35.000 | |||
35101800 | SQ YD | AGGREGATE BASE COURSE, TYPE B 6" | Base items | 918.000 | |||
40201000 | TON | AGGREGATE FOR TEMPORARY ACCESS | Base items | 39.000 | |||
40603335 | TON | HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 | Base items | 155.000 | |||
42001300 | SQ YD | PROTECTIVE COAT | Base items | 47.000 | |||
42400200 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH | Base items | 313.000 | |||
42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 20.000 | |||
44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 51.000 | |||
44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 156.000 | |||
54213657 | EACH | PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12" | Base items | 1.000 | |||
542A0217 | FOOT | PIPE CULVERTS, CLASS A, TYPE 1 12" | Base items | 16.000 | |||
60603800 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 | Base items | 51.000 | |||
66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 290.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
X0322936 | EACH | REMOVE EXISTING FLARED END SECTION | Base items | 1.000 | |||
X0327036 | SQ YD | BIKE PATH REMOVAL | Base items | 666.000 | |||
X4020900 | SQ YD | AGGREGATE SURFACE COURSE, TYPE B (SPECIAL) | Base items | 6,336.000 | |||
X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
XX003338 | EACH | TEST HOLE | Base items | 10.000 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
No More Pay Items |