Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","04/24/2020",089-76N45,8,0.00%,0.00%,"Madison","Bridges","Bridge painting along I-270 over MCT Nickel Plate Bike Trail, 1.4 miles east of IL 157 (SN 060-0051 and 060-0052).", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70200100","L SUM ","NIGHTTIME WORK ZONE LIGHTING","Base items",1.000,, "X0300062","SQ YD ","GRAFFITI REMOVAL","Base items",64.000,, "Z0007101","L SUM ","CONTAINMENT AND DISPOSAL OF LEAD PAINT CLEANING RESIDUES NO. 1","Base items",1.000,, "Z0007102","L SUM ","CONTAINMENT AND DISPOSAL OF LEAD PAINT CLEANING RESIDUES NO. 2","Base items",1.000,, "Z0010501","L SUM ","CLEANING AND PAINTING STEEL BRIDGE NO. 1","Base items",1.000,, "Z0010502","L SUM ","CLEANING AND PAINTING STEEL BRIDGE NO. 2","Base items",1.000,, Contract Specifics "Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative Code 650.70,... ""This contract requires, in addition to the normal IDOT prequalifications requirements, that the Contractor be SSPC - QP1 and QP2 certified. Evidence of certification must be provided prior to receiving authorization to bid."" Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractor's original BC 57 Affidavit of Availability. (BC 57)" "65 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.