Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","04/24/2020",04A-LK013,1,8.00%,0.00%,"McHenry","Miscellaneous","Obstruction Evaluation, Obstruction Removal, and Runway Threshold Remarking", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "AR107508","EACH ","L-806 W C 8' INTERNALLY LIT","Base items",2.000,, "AR108177","L.F. ","3-1/C #8 600 V UG CABLE IN UD","Base items",2600.000,, "AR125565","EACH ","SPLICE CAN","Base items",1.000,, "AR125901","EACH ","REMOVE STAKE MOUNTED LIGHT","Base items",12.000,, "AR125931","EACH ","REPLACE LIGHT LENSE","Base items",18.000,, "AR150520","L SUM ","MOBILIZATION","Base items",1.000,, "AR152410","CU YD ","UNCLASSIFIED EXCAVATION","Base items",1030.000,, "AR152442","CU YD ","OFFSITE BORROW EXCAVATION","Base items",5133.000,, "AR156510","FOOT ","SILT FENCE","Base items",1300.000,, "AR620520","SQ FT ","PAVEMENT MARKING-WATERBORNE","Base items",15500.000,, "AR620525","SQ FT ","PAVEMENT MARKING-BLACK BORDER","Base items",6600.000,, "AR620900","SQ FT ","PAVEMENT MARKING REMOVAL","Base items",43500.000,, "AR901510","ACRE ","SEEDING","Base items",2.300,, "AR908510","ACRE ","MULCHING","Base items",2.300,, Contract Specifics "The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting." "11 Calendar Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.