Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/28/2024","06/11/2021",04A-SR095,8,10.00%,0.00%,"Madison","Pavement, Electrical","Rehabilitate Runway 17/35 Pavement and Lighting", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "AR108108","FOOT ","1/C #8 5 KV UG CABLE","Base items",21300.000,, "AR109200","L SUM ","INSTALL ELECTRICAL EQUIPMENT","Base items",1.000,, "AR110012","FOOT ","2"" DIRECTIONAL BORE","Base items",1290.000,, "AR110202","FOOT ","2"" PVC DUCT, DIRECT BURY","Base items",15750.000,, "AR125400","EACH ","REPLACE ISOLATION TRANSFORMER","Base items",5.000,, "AR125511","EACH ","MIRL, BASE MOUNTED-LED","Base items",58.000,, "AR125512","EACH ","MIRL, INPAVEMENT","Base items",2.000,, "AR125546","EACH ","MI THRESHOLD LIGHT BASE MTD-LED","Base items",16.000,, "AR125561","EACH ","RUNWAY DISTANCE REMAINING SIGN-LED","Base items",5.000,, "AR125565","EACH ","SPLICE CAN","Base items",31.000,, "AR150510","L SUM ","ENGINEER'S FIELD OFFICE","Base items",1.000,, "AR150520","L SUM ","MOBILIZATION","Base items",1.000,, "AR150530","L SUM ","TRAFFIC MAINTENANCE","Base items",1.000,, "AR401614","TON ","BIT. SURF. CSE.-METHOD II, SUPERPAVE","Base items",14885.000,, "AR401640","SQ YD ","BITUMINOUS PAVEMENT GROOVING","Base items",68627.000,, "AR401650","SQ YD ","BITUMINOUS PAVEMENT MILLING","Base items",18982.000,, "AR401900","SQ YD ","REMOVE BITUMINOUS PAVEMENT","Base items",851.000,, "AR603510","GALLON ","BITUMINOUS TACK COAT","Base items",25886.000,, "AR620520","SQ FT ","PAVEMENT MARKING-WATERBORNE","Base items",89813.000,, "AR620525","SQ FT ","PAVEMENT MARKING-BLACK BORDER","Base items",18889.000,, "AR620590","SQ FT ","TEMPORARY MARKING","Base items",89813.000,, "AR751943","EACH ","ADJUST MANHOLE","Base items",2.000,, "AR751952","EACH ","ADJUST UNDERDRAIN STRUCTURE","Base items",21.000,, "AR800476","L SUM ","REMOVE AIRFIELD LIGHTING","Base items",1.000,, "AR800552","EACH ","CONCRETE MAINTENANCE PAD","Base items",2.000,, "AR800564","L SUM ","CABLE & CCR TESTING & CALIBRATION","Base items",1.000,, "AR901510","ACRE ","SEEDING","Base items",3.200,, "AR905530","SQ YD ","TOPSOILING","Base items",15573.000,, "AR908514","ACRE ","LIGHT-DUTY HYDRAULIC MULCH","Base items",3.200,, Contract Specifics "The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting." "75 Calendar Days" "This project is currently unfunded, but actively seeking discretionary funds" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.