Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/28/2024","06/11/2021",209-68D34,4,7.00%,0.00%,"Fulton","Bridges","Replacement of existing S.N. 029-0001 carrying US 24/IL 9 over Copperas Creek, and associated roadway work. at the east end of Banner.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "20100500","ACRE ","TREE REMOVAL, ACRES","Base items",0.750,, "20200100","CU YD ","EARTH EXCAVATION","Alternate B",5750.000,, "20200100","CU YD ","EARTH EXCAVATION","Alternate A",5595.000,, "20400800","CU YD ","FURNISHED EXCAVATION","Alternate A",16820.000,, "20400800","CU YD ","FURNISHED EXCAVATION","Alternate B",16255.000,, "20800150","CU YD ","TRENCH BACKFILL","Base items",272.000,, "21101505","CU YD ","TOPSOIL EXCAVATION AND PLACEMENT","Base items",341.000,, "21101615","SQ YD ","TOPSOIL FURNISH AND PLACE, 4""","Base items",24536.000,, "25000210","ACRE ","SEEDING, CLASS 2A","Base items",5.250,, "25000400","POUND ","NITROGEN FERTILIZER NUTRIENT","Base items",457.000,, "25000500","POUND ","PHOSPHORUS FERTILIZER NUTRIENT","Base items",457.000,, "25000600","POUND ","POTASSIUM FERTILIZER NUTRIENT","Base items",457.000,, "25000750","ACRE ","MOWING","Base items",5.250,, "25100115","ACRE ","MULCH, METHOD 2","Base items",5.250,, "25100630","SQ YD ","EROSION CONTROL BLANKET","Base items",24536.000,, "28000250","POUND ","TEMPORARY EROSION CONTROL SEEDING","Base items",487.000,, "28000305","FOOT ","TEMPORARY DITCH CHECKS","Base items",470.000,, "28000400","FOOT ","PERIMETER EROSION BARRIER","Base items",5115.000,, "28000500","EACH ","INLET AND PIPE PROTECTION","Base items",12.000,, "28000510","EACH ","INLET FILTERS","Base items",6.000,, "28100105","SQ YD ","STONE RIPRAP, CLASS A3","Base items",59.000,, "28100107","SQ YD ","STONE RIPRAP, CLASS A4","Base items",53.000,, "28100109","SQ YD ","STONE RIPRAP, CLASS A5","Base items",2209.000,, "28200200","SQ YD ","FILTER FABRIC","Base items",2063.000,, "31100910","SQ YD ","SUBBASE GRANULAR MATERIAL, TYPE A 12""","Base items",11645.000,, "31101200","SQ YD ","SUBBASE GRANULAR MATERIAL, TYPE B 4""","Base items",479.000,, "31200500","SQ YD ","STABILIZED SUBBASE - HOT-MIX ASPHALT, 4""","Alternate B",10816.000,, "35100500","SQ YD ","AGGREGATE BASE COURSE, TYPE A 6""","Base items",1009.000,, "40600295","POUND ","POLYMERIZED BITUMINOUS MATERIALS (TACK COAT)","Alternate B",7218.000,, "40600295","POUND ","POLYMERIZED BITUMINOUS MATERIALS (TACK COAT)","Alternate A",20541.000,, "40600982","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT","Base items",206.000,, "40603205","TON ","POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50","Base items",30.000,, "40603535","TON ","POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX ""D"", N50","Base items",39.000,, "40701831","SQ YD ","HOT-MIX ASPHALT PAVEMENT (FULL-DEPTH), 7 1/2""","Base items",345.000,, "40701861","SQ YD ","HOT-MIX ASPHALT PAVEMENT (FULL-DEPTH), 9""","Base items",658.000,, "40701896","SQ YD ","HOT-MIX ASPHALT PAVEMENT (FULL-DEPTH), 10 3/4""","Alternate A",8350.000,, "42000080","SQ YD ","PAVEMENT CONNECTOR (PCC) FOR BRIDGE APPROACH SLAB","Base items",360.000,, "42000401","SQ YD ","PORTLAND CEMENT CONCRETE PAVEMENT 9"" (JOINTED)","Alternate B",8350.000,, "42001300","SQ YD ","PROTECTIVE COAT","Alternate B",11357.000,, "42001300","SQ YD ","PROTECTIVE COAT","Alternate A",730.000,, "42300400","SQ YD ","PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH","Base items",264.000,, "44000100","SQ YD ","PAVEMENT REMOVAL","Base items",3337.000,, "44000165","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 4""","Base items",564.000,, "44000200","SQ YD ","DRIVEWAY PAVEMENT REMOVAL","Base items",429.000,, "44004000","FOOT ","PAVED DITCH REMOVAL","Base items",397.000,, "44004250","SQ YD ","PAVED SHOULDER REMOVAL","Base items",1757.000,, "48100500","SQ YD ","AGGREGATE SHOULDERS, TYPE A 6""","Base items",39.000,, "48102100","TON ","AGGREGATE WEDGE SHOULDER, TYPE B","Base items",132.000,, "48203013","SQ YD ","HOT-MIX ASPHALT SHOULDERS, 4""","Base items",564.000,, "48203029","SQ YD ","HOT-MIX ASPHALT SHOULDERS, 8""","Alternate A",2942.000,, "48203029","SQ YD ","HOT-MIX ASPHALT SHOULDERS, 8""","Alternate B",665.000,, "48300400","SQ YD ","PORTLAND CEMENT CONCRETE SHOULDERS 9""","Alternate B",2277.000,, "50100100","EACH ","REMOVAL OF EXISTING STRUCTURES","Base items",1.000,, "50105220","FOOT ","PIPE CULVERT REMOVAL","Base items",463.000,, "50200100","CU YD ","STRUCTURE EXCAVATION","Base items",542.000,, "50200300","CU YD ","COFFERDAM EXCAVATION","Base items",991.000,, "50201121","EACH ","COFFERDAM (TYPE 2) (LOCATION - 1)","Base items",1.000,, "50300225","CU YD ","CONCRETE STRUCTURES","Base items",419.300,, "50300255","CU YD ","CONCRETE SUPERSTRUCTURE","Base items",758.300,, "50300260","SQ YD ","BRIDGE DECK GROOVING","Base items",2918.000,, "50300265","CU YD ","SEAL COAT CONCRETE","Base items",178.000,, "50300300","SQ YD ","PROTECTIVE COAT","Base items",3240.000,, "50500105","L SUM ","FURNISHING AND ERECTING STRUCTURAL STEEL","Base items",1.000,, "50500505","EACH ","STUD SHEAR CONNECTORS","Base items",11130.000,, "50800205","POUND ","REINFORCEMENT BARS, EPOXY COATED","Base items",242010.000,, "50800515","EACH ","BAR SPLICERS","Base items",1021.000,, "50800530","EACH ","MECHANICAL SPLICERS","Base items",322.000,, "51201610","FOOT ","FURNISHING STEEL PILES HP12X63","Base items",1107.000,, "51201710","FOOT ","FURNISHING STEEL PILES HP12X84","Base items",871.000,, "51202305","FOOT ","DRIVING PILES","Base items",1978.000,, "51203610","EACH ","TEST PILE STEEL HP12X63","Base items",1.000,, "51203710","EACH ","TEST PILE STEEL HP12X84","Base items",2.000,, "51500100","EACH ","NAME PLATES","Base items",1.000,, "52000110","FOOT ","PREFORMED JOINT STRIP SEAL","Base items",168.500,, "52100010","EACH ","ELASTOMERIC BEARING ASSEMBLY, TYPE I","Base items",14.000,, "52100520","EACH ","ANCHOR BOLTS, 1""","Base items",56.000,, "52100540","EACH ","ANCHOR BOLTS, 1 1/2""","Base items",28.000,, "52200020","SQ FT ","TEMPORARY SOIL RETENTION SYSTEM","Base items",3963.000,, "54213657","EACH ","PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12""","Base items",1.000,, "54213660","EACH ","PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15""","Base items",3.000,, "54213663","EACH ","PRECAST REINFORCED CONCRETE FLARED END SECTIONS 18""","Base items",1.000,, "54213675","EACH ","PRECAST REINFORCED CONCRETE FLARED END SECTIONS 30""","Base items",2.000,, "54262721","EACH ","METAL FLARED END SECTIONS 21""","Base items",1.000,, "54262736","EACH ","METAL FLARED END SECTIONS 36""","Base items",2.000,, "542D0220","FOOT ","PIPE CULVERTS, CLASS D, TYPE 1 15""","Base items",37.000,, "542D0226","FOOT ","PIPE CULVERTS, CLASS D, TYPE 1 21""","Base items",71.000,, "542D0241","FOOT ","PIPE CULVERTS, CLASS D, TYPE 1 36""","Base items",10.000,, "542D1081","FOOT ","PIPE CULVERTS, CLASS D, TYPE 2 36""","Base items",43.000,, "550A0050","FOOT ","STORM SEWERS, CLASS A, TYPE 1 12""","Base items",13.000,, "550A0070","FOOT ","STORM SEWERS, CLASS A, TYPE 1 15""","Base items",27.000,, "550A0090","FOOT ","STORM SEWERS, CLASS A, TYPE 1 18""","Base items",60.000,, "550A0120","FOOT ","STORM SEWERS, CLASS A, TYPE 1 24""","Base items",122.000,, "550A0130","FOOT ","STORM SEWERS, CLASS A, TYPE 1 27""","Base items",82.000,, "550A0140","FOOT ","STORM SEWERS, CLASS A, TYPE 1 30""","Base items",597.000,, "59100100","SQ YD ","GEOCOMPOSITE WALL DRAIN","Base items",186.000,, "60100060","EACH ","CONCRETE HEADWALLS FOR PIPE DRAINS","Base items",3.000,, "60108100","FOOT ","PIPE UNDERDRAINS 4"" (SPECIAL)","Base items",24.000,, "60219000","EACH ","MANHOLES, TYPE A, 4'-DIAMETER, TYPE 8 GRATE","Base items",1.000,, "60221100","EACH ","MANHOLES, TYPE A, 5'-DIAMETER, TYPE 1 FRAME, CLOSED LID","Base items",1.000,, "60221700","EACH ","MANHOLES, TYPE A, 5'-DIAMETER, TYPE 8 GRATE","Base items",4.000,, "60224005","EACH ","MANHOLES, TYPE A, 6'-DIAMETER, TYPE 8 GRATE","Base items",1.000,, "60240303","EACH ","INLETS, TYPE B, TYPE 9 FRAME AND GRATE","Base items",2.000,, "60500060","EACH ","REMOVING INLETS","Base items",1.000,, "60600095","CU YD ","CLASS SI CONCRETE (OUTLET)","Base items",0.900,, "60607400","FOOT ","COMBINATION CONCRETE CURB AND GUTTER, TYPE B-9.24","Base items",270.000,, "63000001","FOOT ","STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS","Base items",525.000,, "63100085","EACH ","TRAFFIC BARRIER TERMINAL, TYPE 6","Base items",3.000,, "63100167","EACH ","TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT","Base items",3.000,, "63200310","FOOT ","GUARDRAIL REMOVAL","Base items",595.000,, "64300430","EACH ","IMPACT ATTENUATORS (NON-REDIRECTIVE), TEST LEVEL 2","Base items",1.000,, "66600105","EACH ","FURNISHING AND ERECTING RIGHT OF WAY MARKERS","Base items",13.000,, "66700205","EACH ","PERMANENT SURVEY MARKERS, TYPE I","Base items",5.000,, "66900200","CU YD ","NON-SPECIAL WASTE DISPOSAL","Base items",24.000,, "66900530","EACH ","SOIL DISPOSAL ANALYSIS","Base items",1.000,, "66901001","L SUM ","REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN","Base items",1.000,, "66901003","L SUM ","REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT","Base items",1.000,, "66901006","CAL DA ","REGULATED SUBSTANCES MONITORING","Base items",2.000,, "67000400","CAL MO ","ENGINEER'S FIELD OFFICE, TYPE A","Base items",18.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70103815","CAL DA ","TRAFFIC CONTROL SURVEILLANCE","Base items",300.000,, "70107025","CAL DA ","CHANGEABLE MESSAGE SIGN","Base items",300.000,, "70300100","FOOT ","SHORT TERM PAVEMENT MARKING","Base items",59.000,, "70300150","SQ FT ","SHORT TERM PAVEMENT MARKING REMOVAL","Base items",19.000,, "70300220","FOOT ","TEMPORARY PAVEMENT MARKING - LINE 4""","Base items",36000.000,, "70400100","FOOT ","TEMPORARY CONCRETE BARRIER","Base items",2650.000,, "70400200","FOOT ","RELOCATE TEMPORARY CONCRETE BARRIER","Base items",2390.000,, "70500100","FOOT ","TEMPORARY STEEL PLATE BEAM GUARDRAIL, TYPE A","Base items",75.000,, "70500665","EACH ","TEMPORARY TRAFFIC BARRIER TERMINAL, TYPE 6","Base items",1.000,, "70600250","EACH ","IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3","Base items",3.000,, "70600350","EACH ","IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3","Base items",2.000,, "72000100","SQ FT ","SIGN PANEL - TYPE 1","Base items",9.000,, "72400500","EACH ","RELOCATE SIGN PANEL ASSEMBLY - TYPE A","Base items",9.000,, "72400600","EACH ","RELOCATE SIGN PANEL ASSEMBLY - TYPE B","Base items",1.000,, "72501000","EACH ","TERMINAL MARKER - DIRECT APPLIED","Base items",3.000,, "72800100","FOOT ","TELESCOPING STEEL SIGN SUPPORT","Base items",14.000,, "78009004","FOOT ","MODIFIED URETHANE PAVEMENT MARKING - LINE 4""","Base items",11362.000,, "78009024","FOOT ","MODIFIED URETHANE PAVEMENT MARKING - LINE 24""","Base items",17.000,, "78100100","EACH ","RAISED REFLECTIVE PAVEMENT MARKER","Base items",64.000,, "78200005","EACH ","GUARDRAIL REFLECTORS, TYPE A","Base items",15.000,, "78300200","EACH ","RAISED REFLECTIVE PAVEMENT MARKER REMOVAL","Base items",10.000,, "X0322936","EACH ","REMOVE EXISTING FLARED END SECTION","Base items",3.000,, "X0323660","EACH ","DROP BOX NO.1","Base items",1.000,, "X0327112","ACRE ","STUMP REMOVAL, ACRES","Base items",1.750,, "X0327423","EACH ","CONNECTION TO EXISTING CULVERT","Base items",2.000,, "X1200055","CU YD ","INFILTRATION AGGREGATE","Base items",42.000,, "X2010400","UNIT ","STUMP REMOVAL ONLY","Base items",103.000,, "X4020700","SQ YD ","AGGREGATE SURFACE COURSE, TYPE B 8""","Base items",329.000,, "X4400110","SQ YD ","TEMPORARY PAVEMENT REMOVAL","Base items",3167.000,, "X5030305","SQ YD ","CONCRETE WEARING SURFACE, 5""","Base items",558.400,, "X5040100","SQ FT ","PRECAST BRIDGE APPROACH SLAB","Base items",4875.000,, "X6062700","FOOT ","CONCRETE GUTTER, TYPE A (SPECIAL)","Base items",114.000,, "X6670109","EACH ","PERMANENT SURVEY TIES","Base items",5.000,, "X7010216","L SUM ","TRAFFIC CONTROL AND PROTECTION, (SPECIAL)","Base items",1.000,, "X7030005","SQ FT ","TEMPORARY PAVEMENT MARKING REMOVAL","Base items",12000.000,, "X7040125","EACH ","PINNING TEMPORARY CONCRETE BARRIER","Base items",1270.000,, "X7050165","EACH ","TEMPORARY TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL)","Base items",1.000,, "Z0001002","TON ","GUARDRAIL AGGREGATE EROSION CONTROL","Base items",171.000,, "Z0004522","SQ YD ","HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 6""","Base items",215.000,, "Z0004638","SQ YD ","PAVEMENT BREAKING","Base items",2711.000,, "Z0007601","L SUM ","BUILDING REMOVAL NO. 1","Base items",1.000,, "Z0013798","L SUM ","CONSTRUCTION LAYOUT","Base items",1.000,, "Z0022800","FOOT ","FENCE REMOVAL","Base items",550.000,, "Z0024475","EACH ","TUBULAR MARKER","Base items",77.000,, "Z0034105","TON ","MATERIAL TRANSFER DEVICE","Alternate B",2723.000,, "Z0034105","TON ","MATERIAL TRANSFER DEVICE","Alternate A",8770.000,, "Z0046304","FOOT ","PIPE UNDERDRAINS FOR STRUCTURES 4""","Base items",250.000,, "Z0062456","SQ YD ","TEMPORARY PAVEMENT","Base items",4677.000,, "Z0076600","HOUR ","TRAINEES","Base items",1000.000,0.80,800.00000 "Z0076604","HOUR ","TRAINEES TRAINING PROGRAM GRADUATE","Base items",1000.000,15.00,15000.00000 Contract Specifics "Project Labor Agreement " "160 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.