Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","06/15/2018",048-72K54,6,0.00%,0.00%,"Pike","Bridges","Deck and substructure repairs on 3 bridges: 1) SN 075-0089 carrying IL 96 over I-72 at the Hull interchange; 2) Sn 075-0103 carrying CH 4 over I-72 at the Barry interchange; 3) SN 075-0112 carrying IL 107 over I-72 north of Pittsfield.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "59300100","CU YD ","CONTROLLED LOW-STRENGTH MATERIAL","Base items",29.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70100420","EACH ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701411","Base items",6.000,, "70100450","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701201","Base items",1.000,, "70100700","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701406","Base items",1.000,, "70106500","EACH ","TEMPORARY BRIDGE TRAFFIC SIGNALS","Base items",3.000,, "X7010200","EACH ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701316 (SPECIAL)","Base items",3.000,, "X7015005","CAL DA ","CHANGEABLE MESSAGE SIGN","Base items",180.000,, "Z0001800","SQ YD ","APPROACH SLAB REPAIR (PARTIAL DEPTH)","Base items",151.000,, "Z0012754","SQ FT ","STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES)","Base items",549.000,, "Z0012755","SQ FT ","STRUCTURAL REPAIR OF CONCRETE (DEPTH GREATER THAN 5 INCHES)","Base items",154.000,, "Z0016200","SQ YD ","DECK SLAB REPAIR (PARTIAL)","Base items",46.000,, "Z0021904","FOOT ","SILICONE JOINT SEALER, 1""","Base items",41.000,, "Z0021914","FOOT ","SILICONE JOINT SEALER, 2.75""","Base items",413.000,, Contract Specifics "55 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.