Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","01/20/2023",074-91609,5,2.00%,0.00%,"Champaign","Pavement","Resurface Main Street from 0.1 mile west of Division Street to east of Lincoln Street, North Division Street from north of State Street to north of US 150, and State Street from 0.1 mile west of Division Street to 0.1 mile east of Division Street in Mahomet.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "40600290","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",7262.000,, "40600370","FOOT ","LONGITUDINAL JOINT SEALANT","Base items",7058.000,, "40604152","TON ","POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX ""C"", N70","Base items",2035.000,, "40800050","TON ","INCIDENTAL HOT-MIX ASPHALT SURFACING","Base items",50.000,, "42400300","SQ FT ","PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH","Base items",2064.000,, "42400800","SQ FT ","DETECTABLE WARNINGS","Base items",124.000,, "44000157","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 2""","Base items",15472.000,, "44000400","FOOT ","GUTTER REMOVAL","Base items",200.000,, "44000500","FOOT ","COMBINATION CURB AND GUTTER REMOVAL","Base items",269.000,, "44000600","SQ FT ","SIDEWALK REMOVAL","Base items",1799.000,, "44201301","SQ YD ","CLASS C PATCHES, TYPE I, 6 INCH","Base items",52.000,, "44201305","SQ YD ","CLASS C PATCHES, TYPE II, 6 INCH","Base items",150.000,, "44201309","SQ YD ","CLASS C PATCHES, TYPE III, 6 INCH","Base items",50.000,, "44201311","SQ YD ","CLASS C PATCHES, TYPE IV, 6 INCH","Base items",70.000,, "56109210","EACH ","WATER VALVES TO BE ADJUSTED","Base items",16.000,, "60255500","EACH ","MANHOLES TO BE ADJUSTED","Base items",26.000,, "60602500","FOOT ","CONCRETE GUTTER, TYPE A","Base items",200.000,, "60604400","FOOT ","COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18","Base items",269.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70102620","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701501","Base items",1.000,, "70102635","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701701","Base items",1.000,, "70102640","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701801","Base items",1.000,, "78000100","SQ FT ","THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS","Base items",500.000,, "78000200","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 4""","Base items",9443.000,, "78000500","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 8""","Base items",318.000,, "78000600","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 12""","Base items",1152.000,, "78000650","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 24""","Base items",225.000,, Contract Specifics "Completion Date: August 11, 2023 Plus 10 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.