Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","01/20/2023",081-62H02,1,18.00%,0.00%,"Kane","Bridges","(300-Ft) Culvert replacement, retaining wall construction, railroad track re-alignment, roadway resurfacing, pavement marking and ADA ramp reconstruction for IL 31 Culvert over Ditch located in the Village of South Elgin in Kane Co.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "20101100","EACH ","TREE TRUNK PROTECTION","Base items",9.000,, "20200100","CU YD ","EARTH EXCAVATION","Base items",570.000,, "20201200","CU YD ","REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL","Base items",17.000,, "20700220","CU YD ","POROUS GRANULAR EMBANKMENT","Base items",223.000,, "20800150","CU YD ","TRENCH BACKFILL","Base items",362.000,, "20900110","CU YD ","POROUS GRANULAR BACKFILL","Base items",274.000,, "21001000","SQ YD ","GEOTECHNICAL FABRIC FOR GROUND STABILIZATION","Base items",49.000,, "21101505","CU YD ","TOPSOIL EXCAVATION AND PLACEMENT","Base items",115.000,, "21101620","SQ YD ","TOPSOIL FURNISH AND PLACE, 5""","Base items",419.000,, "25000210","ACRE ","SEEDING, CLASS 2A","Base items",0.250,, "25000400","POUND ","NITROGEN FERTILIZER NUTRIENT","Base items",32.000,, "25000500","POUND ","PHOSPHORUS FERTILIZER NUTRIENT","Base items",32.000,, "25000600","POUND ","POTASSIUM FERTILIZER NUTRIENT","Base items",32.000,, "25100125","ACRE ","MULCH, METHOD 3","Base items",0.250,, "25100630","SQ YD ","EROSION CONTROL BLANKET","Base items",176.000,, "25200110","SQ YD ","SODDING, SALT TOLERANT","Base items",688.000,, "25200200","UNIT ","SUPPLEMENTAL WATERING","Base items",3.600,, "28000250","POUND ","TEMPORARY EROSION CONTROL SEEDING","Base items",7.000,, "28000400","FOOT ","PERIMETER EROSION BARRIER","Base items",191.000,, "28000510","EACH ","INLET FILTERS","Base items",9.000,, "28100709","SQ YD ","STONE DUMPED RIPRAP, CLASS A5","Base items",274.000,, "28200200","SQ YD ","FILTER FABRIC","Base items",274.000,, "30300001","CU YD ","AGGREGATE SUBGRADE IMPROVEMENT","Base items",17.000,, "30300112","SQ YD ","AGGREGATE SUBGRADE IMPROVEMENT 12""","Base items",195.000,, "31101200","SQ YD ","SUBBASE GRANULAR MATERIAL, TYPE B 4""","Base items",382.000,, "35101800","SQ YD ","AGGREGATE BASE COURSE, TYPE B 6""","Base items",184.000,, "35501324","SQ YD ","HOT-MIX ASPHALT BASE COURSE, 10""","Base items",147.000,, "35600716","SQ YD ","HOT-MIX ASPHALT BASE COURSE WIDENING, 10""","Base items",37.000,, "40600290","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",421.000,, "40600370","FOOT ","LONGITUDINAL JOINT SEALANT","Base items",325.000,, "40600982","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT","Base items",21.000,, "40604062","TON ","HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX ""D"", N70","Base items",105.000,, "42300400","SQ YD ","PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH","Base items",184.000,, "42400200","SQ FT ","PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH","Base items",132.000,, "42400800","SQ FT ","DETECTABLE WARNINGS","Base items",13.000,, "44000100","SQ YD ","PAVEMENT REMOVAL","Base items",143.000,, "44000157","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 2""","Base items",735.000,, "44000200","SQ YD ","DRIVEWAY PAVEMENT REMOVAL","Base items",162.000,, "44000400","FOOT ","GUTTER REMOVAL","Base items",34.000,, "44000500","FOOT ","COMBINATION CURB AND GUTTER REMOVAL","Base items",411.000,, "44000600","SQ FT ","SIDEWALK REMOVAL","Base items",151.000,, "44201771","SQ YD ","CLASS D PATCHES, TYPE IV, 10 INCH","Base items",124.000,, "48101498","SQ YD ","AGGREGATE SHOULDERS, TYPE B 4""","Base items",81.000,, "48203029","SQ YD ","HOT-MIX ASPHALT SHOULDERS, 8""","Base items",130.000,, "50100100","EACH ","REMOVAL OF EXISTING STRUCTURES","Base items",1.000,, "50200100","CU YD ","STRUCTURE EXCAVATION","Base items",66.000,, "50200450","CU YD ","REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL FOR STRUCTURES","Base items",39.000,, "50300225","CU YD ","CONCRETE STRUCTURES","Base items",86.900,, "50300285","SQ FT ","FORM LINER TEXTURED SURFACE","Base items",1475.000,, "50500505","EACH ","STUD SHEAR CONNECTORS","Base items",256.000,, "50800205","POUND ","REINFORCEMENT BARS, EPOXY COATED","Base items",15420.000,, "50901720","FOOT ","BICYCLE RAILING","Base items",170.000,, "51500100","EACH ","NAME PLATES","Base items",1.000,, "52200105","FOOT ","FURNISHING SOLDIER PILES (W SECTION)","Base items",622.000,, "52200200","CU FT ","DRILLING AND SETTING SOLDIER PILES (IN SOIL)","Base items",1850.000,, "52200205","CU FT ","DRILLING AND SETTING SOLDIER PILES (IN ROCK)","Base items",1629.000,, "52200250","SQ FT ","UNTREATED TIMBER LAGGING","Base items",1369.000,, "54011006","FOOT ","PRECAST CONCRETE BOX CULVERTS 10' X 6'","Base items",65.000,, "550A0640","FOOT ","STORM SEWERS, CLASS A, TYPE 3 12""","Base items",279.000,, "58600101","CU YD ","GRANULAR BACKFILL FOR STRUCTURES","Base items",80.000,, "58700300","SQ FT ","CONCRETE SEALER","Base items",1286.000,, "59100100","SQ YD ","GEOCOMPOSITE WALL DRAIN","Base items",166.000,, "60100060","EACH ","CONCRETE HEADWALLS FOR PIPE DRAINS","Base items",2.000,, "60108200","FOOT ","PIPE UNDERDRAINS 6"" (SPECIAL)","Base items",45.000,, "60108206","FOOT ","PIPE UNDERDRAINS, TYPE 2, 6""","Base items",833.000,, "60201340","EACH ","CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 24 FRAME AND GRATE","Base items",9.000,, "60500050","EACH ","REMOVING CATCH BASINS","Base items",1.000,, "60500060","EACH ","REMOVING INLETS","Base items",1.000,, "60603800","FOOT ","COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12","Base items",46.000,, "60605000","FOOT ","COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24","Base items",595.000,, "63200310","FOOT ","GUARDRAIL REMOVAL","Base items",140.000,, "66900200","CU YD ","NON-SPECIAL WASTE DISPOSAL","Base items",270.000,, "66900530","EACH ","SOIL DISPOSAL ANALYSIS","Base items",1.000,, "66901001","L SUM ","REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN","Base items",1.000,, "66901003","L SUM ","REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT","Base items",1.000,, "66901006","CAL DA ","REGULATED SUBSTANCES MONITORING","Base items",40.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70106800","CAL MO ","CHANGEABLE MESSAGE SIGN","Base items",28.000,, "72400500","EACH ","RELOCATE SIGN PANEL ASSEMBLY - TYPE A","Base items",1.000,, "72400710","SQ FT ","RELOCATE SIGN PANEL - TYPE 1","Base items",15.000,, "72800100","FOOT ","TELESCOPING STEEL SIGN SUPPORT","Base items",30.000,, "78000200","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 4""","Base items",922.000,, "78100100","EACH ","RAISED REFLECTIVE PAVEMENT MARKER","Base items",20.000,, "78300200","EACH ","RAISED REFLECTIVE PAVEMENT MARKER REMOVAL","Base items",20.000,, "X0900064","SQ YD ","MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES","Base items",15.000,, "X0900075","EACH ","COFFERDAM (TYPE 1) (IN-STREAM/WETLAND WORK)","Base items",1.000,, "X2010400","UNIT ","STUMP REMOVAL ONLY","Base items",278.000,, "X6700407","CAL MO ","ENGINEER'S FIELD OFFICE, TYPE A (D1)","Base items",12.000,, "X7010216","L SUM ","TRAFFIC CONTROL AND PROTECTION, (SPECIAL)","Base items",1.000,, "Z0007120","SQ YD ","WELDED WIRE FABRIC 6X6","Base items",184.000,, "Z0013798","L SUM ","CONSTRUCTION LAYOUT","Base items",1.000,, "Z0030850","SQ FT ","TEMPORARY INFORMATION SIGNING","Base items",13.000,, "Z0054400","CU YD ","ROCK FILL","Base items",39.000,, "Z0073510","EACH ","TEMPORARY TRAFFIC SIGNAL TIMING","Base items",4.000,, "Z0076302","LSUM ","RAILROAD TRACKWORK","Base items",1.000,, "Z0076600","HOUR ","TRAINEES","Base items",1000.000,0.80,800.00000 "Z0076604","HOUR ","TRAINEES TRAINING PROGRAM GRADUATE","Base items",1000.000,15.00,15000.00000 Contract Specifics "Completion Date: October 31, 2023 Plus 5 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.