Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/28/2024","01/20/2023",014-68G91,4,0.00%,0.00%,"Knox","Bridges","Bridge Preservation on S.N. 048-0080 over Spoon River, S .N. 048-0085 and S.N. 048-0086 over Cadwell Creek (2 locations) and S .N. 048-0089 over Branch of Brandywine creek.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "28100707","SQ YD ","STONE DUMPED RIPRAP, CLASS A4","Base items",127.000,, "35100300","SQ YD ","AGGREGATE BASE COURSE, TYPE A 4""","Base items",15.000,, "40600290","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",2802.000,, "40600982","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT","Base items",2046.000,, "40603205","TON ","POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50","Base items",19.000,, "40604050","TON ","HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX ""C"", N50","Base items",172.000,, "44000165","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 4""","Base items",923.000,, "44004250","SQ YD ","PAVED SHOULDER REMOVAL","Base items",15.000,, "48102100","TON ","AGGREGATE WEDGE SHOULDER, TYPE B","Base items",11.000,, "48203100","TON ","HOT-MIX ASPHALT SHOULDERS","Base items",210.000,, "48300500","SQ YD ","PORTLAND CEMENT CONCRETE SHOULDERS 10""","Base items",15.000,, "50102400","CU YD ","CONCRETE REMOVAL","Base items",9.100,, "50300255","CU YD ","CONCRETE SUPERSTRUCTURE","Base items",9.500,, "50300260","SQ YD ","BRIDGE DECK GROOVING","Base items",3207.000,, "50300300","SQ YD ","PROTECTIVE COAT","Base items",3401.000,, "50800205","POUND ","REINFORCEMENT BARS, EPOXY COATED","Base items",1490.000,, "50800515","EACH ","BAR SPLICERS","Base items",28.000,, "52000110","FOOT ","PREFORMED JOINT STRIP SEAL","Base items",65.000,, "60300105","EACH ","FRAMES AND GRATES TO BE ADJUSTED","Base items",10.000,, "60600605","FOOT ","CONCRETE CURB, TYPE B","Base items",32.000,, "63300575","FOOT ","REMOVE AND REERECT RAIL ELEMENT OF EXISTING GUARDRAIL","Base items",1520.000,, "67000400","CAL MO ","ENGINEER'S FIELD OFFICE, TYPE A","Base items",7.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70100405","EACH ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701321","Base items",4.000,, "70100450","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701201","Base items",1.000,, "70106500","EACH ","TEMPORARY BRIDGE TRAFFIC SIGNALS","Base items",4.000,, "70106700","EACH ","TEMPORARY RUMBLE STRIPS","Base items",24.000,, "70107005","FOOT ","PAVEMENT MARKING BLACKOUT TAPE, 5""","Base items",5850.000,, "70107025","CAL DA ","CHANGEABLE MESSAGE SIGN","Base items",21.000,, "70300100","FOOT ","SHORT TERM PAVEMENT MARKING","Base items",135.000,, "70300150","SQ FT ","SHORT TERM PAVEMENT MARKING REMOVAL","Base items",1995.000,, "70300221","FOOT ","TEMPORARY PAVEMENT MARKING - LINE 4""- PAINT","Base items",8596.000,, "70400100","FOOT ","TEMPORARY CONCRETE BARRIER","Base items",1813.000,, "70400200","FOOT ","RELOCATE TEMPORARY CONCRETE BARRIER","Base items",1813.000,, "70600250","EACH ","IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3","Base items",8.000,, "70600350","EACH ","IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3","Base items",8.000,, "78009004","FOOT ","MODIFIED URETHANE PAVEMENT MARKING - LINE 4""","Base items",8596.000,, "78300202","SQ FT ","PAVEMENT MARKING REMOVAL - WATER BLASTING","Base items",2865.000,, "X0556100","SQ YD ","PARTIAL DEPTH PATCHING (SPECIAL)","Base items",220.000,, "X4421000","TON ","PARTIAL DEPTH PATCHING","Base items",25.000,, "X7011800","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21","Base items",1.000,, "Z0001905","POUND ","STRUCTURAL STEEL REPAIR","Base items",170.000,, "Z0012130","SQ YD ","BRIDGE DECK SCARIFICATION 3/4""","Base items",3398.000,, "Z0012162","SQ YD ","BRIDGE DECK MICROSILICA CONCRETE OVERLAY 2 1/4""","Base items",3398.000,, "Z0016001","SQ YD ","DECK SLAB REPAIR (FULL DEPTH, TYPE I)","Base items",2.900,, "Z0016002","SQ YD ","DECK SLAB REPAIR (FULL DEPTH, TYPE II)","Base items",9.900,, "Z0018002","EACH ","DRAINAGE SCUPPERS, DS-11","Base items",4.000,, Contract Specifics "110 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.