Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","01/19/2018",05A-HA029,9,1.00%,0.00%,"Saline","Pavement","Rehabilitation of T-Hangar taxiway areas TH/1 and TH/4", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "AR150520","L SUM ","MOBILIZATION","Base items",1.000,, "AR152511","SQ YD ","SUBGRADE REPAIR","Base items",275.000,, "AR156510","FOOT ","SILT FENCE","Base items",550.000,, "AR209510","TON ","CRUSHED AGGREGATE BASE COURSE","Base items",675.000,, "AR401900","SQ YD ","REMOVE BITUMINOUS PAVEMENT","Base items",750.000,, "AR501506","SQ YD ","6"" PCC PAVEMENT","Base items",2800.000,, "AR501530","EACH ","PCC TEST BATCH","Base items",1.000,, "AR501900","SQ YD ","REMOVE PCC PAVEMENT","Base items",1850.000,, "AR751001","FOOT ","TRENCH DRAIN","Base items",180.000,, "AR751411","EACH ","INLET-TYPE A","Base items",1.000,, "AR751940","EACH ","ADJUST INLET","Base items",3.000,, Contract Specifics "The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting." "82 Calendar Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.