Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/28/2024","01/19/2018",03A-GR008,8,9.00%,0.00%,"Bond","Pavement","Rehabilitate Aircraft Parking Apron Designated R1", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "AR110501","FOOT ","1-WAY CONC. ENCASED DUCT","Base items",90.000,, "AR150520","L SUM ","MOBILIZATION","Base items",1.000,, "AR152511","SQ YD ","SUBGRADE REPAIR","Base items",450.000,, "AR162504","L.F. ","CLASS E FENCE 4'","Base items",410.000,, "AR162606","EACH ","CLASS E GATE-6'","Base items",4.000,, "AR162620","EACH ","CLASS E GATE-20'","Base items",1.000,, "AR162900","FOOT ","REMOVE CLASS E FENCE","Base items",340.000,, "AR162910","EACH ","REMOVE CLASS E GATE","Base items",5.000,, "AR201670","SQ YD ","CRACK CONTROL FABRIC","Base items",110.000,, "AR401613","TON ","BIT. SURF. CSE.-METHOD I, SUPERPAVE","Base items",525.000,, "AR401650","SQ YD ","BITUMINOUS PAVEMENT MILLING","Base items",4470.000,, "AR403613","TON ","BIT. BASE CSE.-METHOD I, SUPERPAVE","Base items",525.000,, "AR510510","EACH ","TIE DOWN","Base items",29.000,, "AR510900","EACH ","REMOVE TIE DOWN","Base items",29.000,, "AR602510","GALLON ","BITUMINOUS PRIME COAT","Base items",230.000,, "AR603510","GALLON ","BITUMINOUS TACK COAT","Base items",1570.000,, "AR620520","SQ FT ","PAVEMENT MARKING-WATERBORNE","Base items",420.000,, Contract Specifics "The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting." "49 Calendar Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.