Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","01/19/2018",060-76K61,8,10.00%,0.00%,"St. Clair","Electrical","Installation of a weigh-in-motion data collection system on I-64, west of Summerfield South Road.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70100205","EACH ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701401","Base items",2.000,, "80500100","EACH ","SERVICE INSTALLATION, TYPE A","Base items",1.000,, "81028340","FOOT ","UNDERGROUND CONDUIT, PVC, 1 1/2"" DIA.","Base items",170.000,, "81702400","FOOT ","ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 3-1/C NO. 2","Base items",188.000,, "81702441","FOOT ","ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 2-12/C, 1-12/C GROUND","Base items",66.000,, "X2501000","ACRE ","SEEDING, CLASS 2 (SPECIAL)","Base items",0.250,, "Z0026290","L SUM ","FURNISHING AND INSTALLING WEIGH-IN- MOTION COMPONENTS","Base items",1.000,, Contract Specifics "25 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.