Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","03/06/2020",085-74924,7,6.00%,0.00%,"Effingham","Pavement","7.1 miles of patching, milling, resurfacing and aggregate wedge shoulders on Montrose Blacktop from US 40 in Montrose to north of IL 33 in Dietrich.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "40200800","TON ","AGGREGATE SURFACE COURSE, TYPE B","Base items",283.000,, "40600290","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",67580.000,, "40600982","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT","Base items",266.000,, "40600990","SQ YD ","TEMPORARY RAMP","Base items",186.000,, "40602970","TON ","HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N70","Base items",9818.000,, "40604052","TON ","HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX ""C"", N70","Base items",11220.000,, "40800050","TON ","INCIDENTAL HOT-MIX ASPHALT SURFACING","Base items",101.000,, "44000161","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 3""","Base items",99235.000,, "44000164","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 3 3/4""","Base items",710.000,, "44200140","SQ YD ","PAVEMENT PATCHING, TYPE I, 12 INCH","Base items",32.000,, "44200144","SQ YD ","PAVEMENT PATCHING, TYPE II, 12 INCH","Base items",2127.000,, "44200148","SQ YD ","PAVEMENT PATCHING, TYPE III, 12 INCH","Base items",617.000,, "44200150","SQ YD ","PAVEMENT PATCHING, TYPE IV, 12 INCH","Base items",2640.000,, "48102100","TON ","AGGREGATE WEDGE SHOULDER, TYPE B","Base items",4663.000,, "67000400","CAL MO ","ENGINEER'S FIELD OFFICE, TYPE A","Base items",5.000,, "67000600","CAL MO ","ENGINEER'S FIELD LABORATORY","Base items",5.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70100450","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701201","Base items",1.000,, "70100460","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701306","Base items",1.000,, "70107025","CAL DA ","CHANGEABLE MESSAGE SIGN","Base items",28.000,, "70300100","FOOT ","SHORT TERM PAVEMENT MARKING","Base items",11237.000,, "70300150","SQ FT ","SHORT TERM PAVEMENT MARKING REMOVAL","Base items",1236.000,, "70300210","SQ FT ","TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS","Base items",14.400,, "70300220","FOOT ","TEMPORARY PAVEMENT MARKING - LINE 4""","Base items",84309.000,, "70300270","FOOT ","TEMPORARY PAVEMENT MARKING - LINE 16""","Base items",86.000,, "70300280","FOOT ","TEMPORARY PAVEMENT MARKING - LINE 24""","Base items",40.000,, "78000100","SQ FT ","THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS","Base items",14.400,, "78000200","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 4""","Base items",2097.000,, "78000610","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 16""","Base items",86.000,, "78000650","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 24""","Base items",40.000,, "78001110","FOOT ","PAINT PAVEMENT MARKING - LINE 4""","Base items",81735.000,, "X0326440","SQ YD ","SURFACE REMOVAL, VARIABLE DEPTH (SPECIAL)","Base items",1201.000,, "X0327980","SQ FT ","PAVEMENT MARKING REMOVAL - WATER BLASTING","Base items",1058.000,, "X4060995","SQ YD ","TEMPORARY RAMP (SPECIAL)","Base items",360.000,, "X7830060","SQ FT ","GROOVING FOR RECESSED PAVEMENT MARKING, LETTERS AND SYMBOLS","Base items",14.400,, "X7830070","FOOT ","GROOVING FOR RECESSED PAVEMENT MARKING 5""","Base items",2097.000,, "X7830084","FOOT ","GROOVING FOR RECESSED PAVEMENT MARKING 19""","Base items",86.000,, "X7830090","FOOT ","GROOVING FOR RECESSED PAVEMENT MARKING 25""","Base items",40.000,, "Z0033700","FOOT ","LONGITUDINAL JOINT SEALANT","Base items",37455.000,, "Z0048665","L SUM ","RAILROAD PROTECTIVE LIABILITY INSURANCE","Base items",1.000,, "Z0049799","EACH ","PROTECTING OR RESETTING SURVEY MARKERS","Base items",4.000,, "Z0070202","EACH ","SURVEY MARKER VAULT","Base items",4.000,, Contract Specifics "80 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.