Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","03/06/2020",164-97720,8,12.00%,0.00%,"Bond","Pavement","Resurfacing Elm Street from US 40 to Louis Latzer Drive in Greenville.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "20200100","CU YD ","EARTH EXCAVATION","Base items",135.000,, "28000305","FOOT ","TEMPORARY DITCH CHECKS","Base items",290.000,, "28000400","FOOT ","PERIMETER EROSION BARRIER","Base items",1206.000,, "28000500","EACH ","INLET AND PIPE PROTECTION","Base items",21.000,, "28100205","TON ","STONE RIPRAP, CLASS A3","Base items",21.000,, "40600290","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",4106.000,, "40600982","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT","Base items",126.000,, "40602970","TON ","HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N70","Base items",864.000,, "40604052","TON ","HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX ""C"", N70","Base items",864.000,, "40800029","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",29.000,, "40800050","TON ","INCIDENTAL HOT-MIX ASPHALT SURFACING","Base items",8.000,, "44000153","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 1""","Base items",10950.000,, "48101200","TON ","AGGREGATE SHOULDERS, TYPE B","Base items",476.000,, "60266600","EACH ","VALVE BOXES TO BE ADJUSTED","Base items",2.000,, "60300105","EACH ","FRAMES AND GRATES TO BE ADJUSTED","Base items",5.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70300220","FOOT ","TEMPORARY PAVEMENT MARKING - LINE 4""","Base items",980.000,, "78000200","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 4""","Base items",980.000,, "78000650","FOOT ","THERMOPLASTIC PAVEMENT MARKING - LINE 24""","Base items",98.000,, "X2500900","ACRE ","SEEDING, CLASS 1 (SPECIAL)","Base items",2.000,, "X7010216","L SUM ","TRAFFIC CONTROL AND PROTECTION, (SPECIAL)","Base items",1.000,, "X7030005","SQ FT ","TEMPORARY PAVEMENT MARKING REMOVAL","Base items",323.000,, "Z0033700","FOOT ","LONGITUDINAL JOINT SEALANT","Base items",4070.000,, Contract Specifics "Hot Mix Asphalt-Small Batch " "15 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.