Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/28/2024","03/06/2020",018-62J34,1,9.00%,0.00%,"Kane","Bridges","Bridge deck repair, joint repair, and bridge deck overlay to the structure carrying IL 38 over the Fox River in Geneva.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "42001300","SQ YD ","PROTECTIVE COAT","Base items",263.000,, "44200050","SQ YD ","WELDED WIRE REINFORCEMENT","Base items",220.000,, "44200970","SQ YD ","CLASS B PATCHES, TYPE II, 10 INCH","Base items",43.000,, "44200974","SQ YD ","CLASS B PATCHES, TYPE III, 10 INCH","Base items",112.000,, "44200976","SQ YD ","CLASS B PATCHES, TYPE IV, 10 INCH","Base items",108.000,, "44201299","EACH ","DOWEL BARS 1 1/2""","Base items",300.000,, "44213200","FOOT ","SAW CUTS","Base items",1100.000,, "44213204","EACH ","TIE BARS 3/4""","Base items",42.000,, "50102400","CU YD ","CONCRETE REMOVAL","Base items",6.300,, "50300255","CU YD ","CONCRETE SUPERSTRUCTURE","Base items",7.700,, "50300300","SQ YD ","PROTECTIVE COAT","Base items",38.000,, "50606701","L SUM ","CLEANING AND PAINTING STRUCTURAL STEEL, LOCATION 1","Base items",1.000,, "50800205","POUND ","REINFORCEMENT BARS, EPOXY COATED","Base items",1770.000,, "50800515","EACH ","BAR SPLICERS","Base items",16.000,, "52000005","FOOT ","PREFORMED JOINT SEAL 1""","Base items",204.000,, "52000110","FOOT ","PREFORMED JOINT STRIP SEAL","Base items",150.000,, "52100500","EACH ","ANCHOR BOLTS, 1/2""","Base items",32.000,, "67000400","CAL MO ","ENGINEER'S FIELD OFFICE, TYPE A","Base items",6.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70107025","CAL DA ","CHANGEABLE MESSAGE SIGN","Base items",90.000,, "70300904","FOOT ","PAVEMENT MARKING TAPE, TYPE IV 4""","Base items",5835.000,, "78009004","FOOT ","MODIFIED URETHANE PAVEMENT MARKING - LINE 4""","Base items",3300.000,, "78009006","FOOT ","MODIFIED URETHANE PAVEMENT MARKING - LINE 6""","Base items",420.000,, "X0326766","FOOT ","CLEAN & RESEAL RELIEF JOINT","Base items",160.000,, "X0327980","SQ FT ","PAVEMENT MARKING REMOVAL - WATER BLASTING","Base items",1310.000,, "X5870015","SQ FT ","BRIDGE DECK CONCRETE SEALER","Base items",7800.000,, "X7010216","L SUM ","TRAFFIC CONTROL AND PROTECTION, (SPECIAL)","Base items",1.000,, "X7030005","SQ FT ","TEMPORARY PAVEMENT MARKING REMOVAL","Base items",1945.000,, "Z0012102","SQ YD ","CONCRETE BRIDGE DECK SCARIFICATION 3/8 INCH","Base items",2576.000,, "Z0012193","SQ YD ","BRIDGE DECK THIN POLYMER OVERLAY 3/8""","Base items",2576.000,, "Z0012754","SQ FT ","STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES)","Base items",17.000,, "Z0016200","SQ YD ","DECK SLAB REPAIR (PARTIAL)","Base items",5.000,, "Z0030850","SQ FT ","TEMPORARY INFORMATION SIGNING","Base items",52.000,, "Z0073510","EACH ","TEMPORARY TRAFFIC SIGNAL TIMING","Base items",6.000,, Contract Specifics "45 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.