Current Date,Letting Date,Item-Contract,District,DBE Goal,VBP Goal,County,Major Work Category,Bulletin Description "03/29/2024","03/05/2021",022-72999,6,10.00%,0.00%,"Sangamon","Bridges","Replacing a single span reinforced concrete slab bridge with a double barrel 10' x 10' precast box culvert on IL 123 over Richland Creek, 0.6 miles north of IL 125.", Pay Item #,UOM,Description,Type,Quantity,Unit Price,Extended "20100500","ACRE ","TREE REMOVAL, ACRES","Base items",0.750,, "20200100","CU YD ","EARTH EXCAVATION","Base items",535.000,, "20400800","CU YD ","FURNISHED EXCAVATION","Base items",670.000,, "25000200","ACRE ","SEEDING, CLASS 2","Base items",0.750,, "25000400","POUND ","NITROGEN FERTILIZER NUTRIENT","Base items",68.000,, "25000500","POUND ","PHOSPHORUS FERTILIZER NUTRIENT","Base items",68.000,, "25000600","POUND ","POTASSIUM FERTILIZER NUTRIENT","Base items",68.000,, "25000700","TON ","AGRICULTURAL GROUND LIMESTONE","Base items",1.500,, "25100115","ACRE ","MULCH, METHOD 2","Base items",0.750,, "28000250","POUND ","TEMPORARY EROSION CONTROL SEEDING","Base items",75.000,, "28000305","FOOT ","TEMPORARY DITCH CHECKS","Base items",88.000,, "28000400","FOOT ","PERIMETER EROSION BARRIER","Base items",501.000,, "28000500","EACH ","INLET AND PIPE PROTECTION","Base items",1.000,, "28100207","TON ","STONE RIPRAP, CLASS A4","Base items",441.000,, "28200200","SQ YD ","FILTER FABRIC","Base items",747.000,, "35501332","SQ YD ","HOT-MIX ASPHALT BASE COURSE, 12""","Base items",180.000,, "40200800","TON ","AGGREGATE SURFACE COURSE, TYPE B","Base items",48.000,, "40201000","TON ","AGGREGATE FOR TEMPORARY ACCESS","Base items",22.000,, "40600275","POUND ","BITUMINOUS MATERIALS (PRIME COAT)","Base items",558.000,, "40600290","POUND ","BITUMINOUS MATERIALS (TACK COAT)","Base items",701.000,, "40604050","TON ","HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX ""C"", N50","Base items",107.000,, "40800050","TON ","INCIDENTAL HOT-MIX ASPHALT SURFACING","Base items",6.000,, "44000100","SQ YD ","PAVEMENT REMOVAL","Base items",180.000,, "44000157","SQ YD ","HOT-MIX ASPHALT SURFACE REMOVAL, 2""","Base items",951.000,, "44000200","SQ YD ","DRIVEWAY PAVEMENT REMOVAL","Base items",94.000,, "44000400","FOOT ","GUTTER REMOVAL","Base items",14.000,, "44004250","SQ YD ","PAVED SHOULDER REMOVAL","Base items",57.000,, "48101500","SQ YD ","AGGREGATE SHOULDERS, TYPE B 6""","Base items",170.000,, "48203021","SQ YD ","HOT-MIX ASPHALT SHOULDERS, 6""","Base items",172.000,, "48203100","TON ","HOT-MIX ASPHALT SHOULDERS","Base items",40.000,, "50100300","EACH ","REMOVAL OF EXISTING STRUCTURES NO. 1","Base items",1.000,, "50100400","EACH ","REMOVAL OF EXISTING STRUCTURES NO. 2","Base items",1.000,, "50105220","FOOT ","PIPE CULVERT REMOVAL","Base items",137.000,, "50200450","CU YD ","REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL FOR STRUCTURES","Base items",228.000,, "50800205","POUND ","REINFORCEMENT BARS, EPOXY COATED","Base items",6300.000,, "51500100","EACH ","NAME PLATES","Base items",1.000,, "54003000","CU YD ","CONCRETE BOX CULVERTS","Base items",78.200,, "54011010","FOOT ","PRECAST CONCRETE BOX CULVERTS 10' X 10'","Base items",170.000,, "54262718","EACH ","METAL FLARED END SECTIONS 18""","Base items",2.000,, "542D1063","FOOT ","PIPE CULVERTS, CLASS D, TYPE 2 18""","Base items",88.000,, "59100100","SQ YD ","GEOCOMPOSITE WALL DRAIN","Base items",251.000,, "60500060","EACH ","REMOVING INLETS","Base items",1.000,, "60600095","CU YD ","CLASS SI CONCRETE (OUTLET)","Base items",8.600,, "60602500","FOOT ","CONCRETE GUTTER, TYPE A","Base items",22.000,, "63200310","FOOT ","GUARDRAIL REMOVAL","Base items",462.000,, "66600105","EACH ","FURNISHING AND ERECTING RIGHT OF WAY MARKERS","Base items",8.000,, "67000400","CAL MO ","ENGINEER'S FIELD OFFICE, TYPE A","Base items",8.000,, "67100100","L SUM ","MOBILIZATION","Base items",1.000,, "70100450","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701201","Base items",1.000,, "70100460","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD 701306","Base items",1.000,, "70107025","CAL DA ","CHANGEABLE MESSAGE SIGN","Base items",150.000,, "70300100","FOOT ","SHORT TERM PAVEMENT MARKING","Base items",104.000,, "70300150","SQ FT ","SHORT TERM PAVEMENT MARKING REMOVAL","Base items",35.000,, "78001120","FOOT ","PAINT PAVEMENT MARKING - LINE 5""","Base items",820.000,, "78300200","EACH ","RAISED REFLECTIVE PAVEMENT MARKER REMOVAL","Base items",2.000,, "X0327902","EACH ","MAILBOX REMOVE AND REPLACE","Base items",1.000,, "X0900064","SQ YD ","MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES","Base items",251.000,, "X2600012","EACH ","REMOVE AND RELOCATE SIGN PANEL AND POLE ASSEMBLY","Base items",1.000,, "X7011800","L SUM ","TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21","Base items",1.000,, "Z0013798","L SUM ","CONSTRUCTION LAYOUT","Base items",1.000,, "Z0015550","CU YD ","DEBRIS REMOVAL","Base items",8.000,, "Z0016702","L SUM ","DETOUR SIGNING","Base items",1.000,, "Z0023602","CU YD ","GRANULAR CULVERT BACKFILL","Base items",243.000,, "Z0054517","TON ","ROCK FILL - FOUNDATION","Base items",505.000,, "Z0076600","HOUR ","TRAINEES","Base items",500.000,0.80,400.00000 "Z0076604","HOUR ","TRAINEES TRAINING PROGRAM GRADUATE","Base items",500.000,15.00,7500.00000 Contract Specifics "Completion Date: August 15, 2021 Plus 10 Working Days" *** Do not import this pay item list into the IDOT electronic bidding system. You can only import the pay items that were exported from the IDOT electronic bidding system.